黄色AV免费看,国产在线一区二区三区麻酥酥,波多小福利,葵司在线观看亚洲一区二区

濟南富強門業(yè)有限公司網(wǎng)站 在線留言 聯(lián)系我們

服務咨詢熱線

151 6888 2846

熱門關鍵詞: 水晶折疊門 水晶卷簾門 抗風卷簾門

公司新聞

首頁>>新聞資訊>>公司新聞
聯(lián)系我們
濟南富強門業(yè)有限公司

聯(lián)系人:林經(jīng)理

電話:151 6888 2846

郵箱:527800164@qq.com

地址:濟南市歷下區(qū)化纖廠路8號3號樓101號

保證卷簾門安裝質量方式

來源:http://foryouled.cn 日期:2021-12-06 發(fā)布人:
卷簾門施工工藝程序
Construction process procedure of rolling shutter door
(1)手動卷簾門工藝程序:定位、放線一安裝卷筒一安裝手動機構一簾板與卷筒連接一安裝導軌一試運轉一安裝防護罩。
(1) Process procedure of manual rolling shutter door: positioning and setting out - Installation of drum - Installation of manual mechanism - connection between curtain plate and drum - Installation of guide rail - Test Run - Installation of protective cover.
(2)電動卷簾門工藝程序:定位、放線_安裝卷簡一安裝電機、減速器一安裝電氣控制系統(tǒng)一空載試車一簾板與卷筒連接_安裝導軌一安裝水幕噴啉系統(tǒng)一試運轉一安裝防護罩。
(2) Process procedure of electric rolling shutter door: positioning and setting out_ Installation of winding sheet - Installation of motor and reducer - Installation of electrical control system - no-load commissioning - connection between curtain plate and winding drum_ Install the guide rail, install the water curtain spraying system, test run and install the protective cover.
2.定位放線卷簾門安裝方式有洞內(nèi)安裝、洞外安裝、洞中安裝三種。即卷簾門裝在門洞內(nèi),簾片向內(nèi)側卷起;卷簾門裝在門洞外,簾片向外卷起和卷簾門裝在門洞中,簾片可向外側或向內(nèi)側卷起。因此,定位放線時應根據(jù)設計要求彈出兩導軌垂直線及卷簡線并測量洞口標高。定位放線后,應檢查實際預埋鐵件的數(shù)量、位置與圖紙核對,如不符合產(chǎn)品說明書的要求,應進行處理。
2. There are three installation modes of positioning and setting out roller shutter door: installation inside the tunnel, installation outside the tunnel and installation in the tunnel. That is, the rolling shutter door is installed in the door opening, and the curtain sheet is rolled up to the inside; The rolling shutter door is installed outside the door opening, the curtain sheet is rolled outward, and the rolling shutter door is installed in the door opening, and the curtain sheet can be rolled outward or inward. Therefore, during positioning and setting out, the vertical lines of the two guide rails and the winding center line shall be snapped according to the design requirements, and the elevation of the opening shall be measured. After positioning and setting out, the quantity and position of the actual embedded iron parts shall be checked and checked with the drawings. If they do not meet the requirements of the product manual, they shall be handled.
濟南卷簾門
3.安裝卷筒安裝卷筒時,應使卷筒軸保持水平,并使卷筒與導軌之間距離兩端保持一致,卷筒臨時固定后進行檢查,調(diào)整、校正合格后,與支架預埋鐵件用電焊焊牢。卷筒安裝后應轉動靈活。
3. Install the drum. When installing the drum, keep the drum shaft horizontal and keep the distance between the drum and the guide rail consistent at both ends. After the drum is temporarily fixed, check it. After adjustment and correction are qualified, weld it firmly with the embedded iron parts of the support by electric welding. The drum shall rotate flexibly after installation.
4.簾板安裝簾板事先裝配好,再安裝在卷筒上。門簾板有正反向,安裝時要注意,不得裝反。
4. Curtain plate installation the curtain plate shall be assembled in advance and then installed on the drum. The door curtain plate has positive and negative directions. Attention shall be paid during installation, and it shall not be installed reversely.
5.安裝導軌按圖紙規(guī)定位置線找直、吊正軌道,保證軌道槽口尺寸準確,上下一致,使導軌在同一垂直平面上,然后用連接件與墻體上的預埋鐵件焊牢。
5. Install the guide rail, align and hang the rail according to the position line specified in the drawing, ensure that the size of the rail notch is accurate and consistent up and down, make the guide rail on the same vertical plane, and then weld it firmly with the embedded iron parts on the wall with connectors.
6.安裝水幕噴淋系統(tǒng)防火卷簾門應安裝水幕噴淋系統(tǒng)。水幕噴淋系統(tǒng),應與總控制系統(tǒng)連接。安裝后,應試驗。
6. Install the water curtain spraying system. The fireproof rolling shutter door shall be installed with the water curtain spraying system. The water curtain spray system shall be connected with the main control system. After installation, the test shall be carried out.
7.試運轉先手動試運行,再用電動機啟閉數(shù)次,調(diào)整無卡住、阻滯及異常噪聲等現(xiàn)象為合格。
7. The test run shall be conducted manually first, and then the motor shall be opened and closed for several times. It is qualified if there is no jamming, block and abnormal noise.
8.安裝卷筒防護罩
8. Install the drum guard
以上的精彩內(nèi)容就是小編今天為您提供的內(nèi)容,更多的精彩內(nèi)容來自: 濟南卷簾門詳情請點擊我們的網(wǎng)站關注:http://foryouled.cn
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from Jinan roller shutter door. For details, please click our website to pay attention to: http://foryouled.cn

閱讀/ Recommended reading

  在濟南的街頭巷尾,卷簾門是商鋪、車庫的 “衛(wèi)士”,但偶爾它也會 “鬧脾氣” 突然打不開,讓人束手無策。無論是清晨急著開店營業(yè),還是傍晚想將愛車停進車庫,卷簾門故障都令人頭疼...

卷簾門VS傳統(tǒng)門鎖:一場空間與的“隱形較量” 2025-06-16
耐用卷簾門挑選指南:從材質到結構的考量 2025-06-14
工廠適用的卷簾門有什么特殊性嗎? 2025-06-12
倉庫卷簾門該如何選擇呢? 2025-05-27
濟南卷簾門怎么做到防銹效果? 2025-05-14
濟南卷簾門是怎么用心做產(chǎn)品的呢? 2025-05-09
淺析防火卷簾門應用時的注意事項 2025-05-07
不想讓卷簾門耽誤時間,來了解卷簾門有哪些規(guī)范吧 2025-05-06
中国老肥熟女一二区| 少妇骚逼导航| 国产AV一区二区三区在| 国产巨屌一区二区三区精品久久久 | 日韩在线视频理论| 男女操bb国产| 制服诱惑一区| 美女主播日逼视频| 中文字幕乱码一区av久| 啪日本啪啪免费视频| 插屁眼高清无码在线| 操逼出白浆| 插入大鸡巴中国国产| 激情播播少妇熟女俱乐部| 夜夜干夜夜干夜夜干夜夜干天天干天天干 | 鸡巴操小穴欧美视频| 欧美性生活视频率| 台湾妹中文娱乐综合在线| 亚洲欧美偷拍91| 免费看欧美逼操逼| 影音先锋91偷拍| 色亭亭久久| 日逼视频高朝| 玖玖 在线 365| 开心激情深爱五月天色四区| 洪江市| 暖暖黄色免费在线| 操骚逼免费福利视频| 亚洲AV第一页| 婷婷爱香蕉| 骚逼鸡巴专区| 欧美中文字幕人妻91| 嗯嗯啊嗯嗯啊在线| 亚洲1区精品av| 大黑鸡巴中文视频| 人人妻人人爽91美女| 婷婷色毛片在线观看117 | 操美国白虎大肥逼| 深爱激情动网在线看| 91久久性爱视频| 日本午夜免费一区二区|